Offloading & sequenced staging
Receive transformers, switchgear and packaged plant; unload and stage in installation order. Agree equipment condition checks, temporary protection and release points with the supplier and site team.
KLOSE delivers industrial lifting, rigging and machinery installation for data centre projects in Vietnam. We offload, move in and precisely position transformers, switchgear, generators, UPS and cooling equipment for EPC teams and operators.
Receive transformers, switchgear and packaged plant; unload and stage in installation order. Agree equipment condition checks, temporary protection and release points with the supplier and site team.
Electric pick-and-carry cranes, hydraulic jacking and skidding bring heavy equipment through constrained routes. Method selection follows verified loads, lifting points, headroom, access geometry and floor capacity.
Set gensets, UPS systems and cooling equipment onto agreed plinths and reference points. Coordinate final alignment and connection clearances with the equipment supplier and M&E trades.
Our crew delivers the agreed mechanical and electrical installation support package. Define fixing, assembly and handover boundaries separately from energisation, testing and commissioning.
From established urban facilities to new campus developments, the route to the plant room changes with the site. Select a project region below for the equipment movements and construction interfaces to address in your enquiry.
For Hanoi's data centre developments and expansions, sequence transformer and switchgear deliveries against the readiness of each installation zone. KLOSE manages offloading, protected internal movement and final alignment, with temporary openings and construction interfaces agreed before dispatch.
Discuss a site in this region – HanoiHo Chi Minh City projects require a site-specific route from urban delivery to plant-room placement. We stage generators and UPS, coordinate cooling-equipment handling and protect finished access routes, with work windows and phase boundaries linked to the contractor's programme.
Discuss a site in this region – Ho Chi Minh CityCities are project regions, not KLOSE offices. Delivery and mobilisation are confirmed against the site scope.
Share the site location, equipment schedule, weights, dimensions, centre-of-gravity and lifting-point information, layout drawings and required installation dates. Identify whether the work is new build, phased expansion or replacement.
Review the unloading area, temporary openings, protected internal route, floor and ground load limits, overhead clearances and final bases. Confirm lifting and skidding methods, exclusion zones and permits with the project team.
KLOSE's crew carries out the agreed lifting and installation scope to the site sequence. Specialist partners may support transport, customs or heavy-crane work; responsibilities and handover points are defined before mobilisation.
Check final position against agreed references, record the condition of the equipment and hand over the completed scope. Release the area to follow-on trades with any outstanding items clearly recorded.
Send the equipment list with weights and dimensions, supplier handling instructions, site and room layouts, delivery sequence and target dates. Include access photographs, known floor limits and the proposed scope split. KLOSE identifies survey requirements and outstanding technical information before confirming the method and commercial scope.
Replacement and expansion work can be scoped around operator-controlled access, permit systems and agreed working windows. We define protected routes, exclusion zones and phase boundaries with the site team. Isolation, service continuity and permission to work remain subject to the operator's procedures; uptime is not guaranteed by a lifting method.
The cities shown are project regions, not a branch network. KLOSE mobilises for the agreed site scope. Specialist partners may provide transport, customs support or heavy cranes when required, with responsibility and equipment transfer points recorded in the proposal.
Not automatically. Offloading, move-in, positioning and agreed M&E installation support are defined in the work package. Electrical connection, energisation, testing and commissioning are separate unless expressly included and assigned to appropriately qualified parties.
Share the project location, equipment list, weights, dimensions, drawings and target delivery sequence. KLOSE can review the handling interfaces with your engineering or EPC team and help define a project-specific scope.
Methods, resources and the scope of work are confirmed following site review and agreement on project requirements.
Discuss your project Download brochure (PDF)