Indonesia | Data centre lifting & installation

KLOSE delivers industrial lifting, rigging and machinery installation for data centre projects in Indonesia. We offload, move in and precisely position transformers, switchgear, generators, UPS and cooling equipment for EPC teams and operators.

From the delivery vehicle to the final position.

Offloading & sequenced staging

Receive transformers, switchgear and packaged plant; unload and stage in installation order. Agree equipment condition checks, temporary protection and release points with the supplier and site team.

Restricted-access lifting & move-in

Electric pick-and-carry cranes, hydraulic jacking and skidding bring heavy equipment through constrained routes. Method selection follows verified loads, lifting points, headroom, access geometry and floor capacity.

Precision plant positioning

Set gensets, UPS systems and cooling equipment onto agreed plinths and reference points. Coordinate final alignment and connection clearances with the equipment supplier and M&E trades.

M&E installation support

Our crew delivers the agreed mechanical and electrical installation support package. Define fixing, assembly and handover boundaries separately from energisation, testing and commissioning.

Local context. Practical delivery.

From established urban facilities to new campus developments, the route to the plant room changes with the site. Select a project region below for the equipment movements and construction interfaces to address in your enquiry.

Jakarta

Jakarta facilities can have tightly constrained receipt and internal movement windows. KLOSE sequences transformer and UPS offloading, protects finished routes and positions equipment to agreed references, with access control and operator interfaces defined for each phase.

Discuss a site in this region – Jakarta

Cikarang

For Cikarang campus developments, align the equipment delivery train with building and plant-room release. We stage gensets and switchgear by installation zone, execute hydraulic jacking or skidding where suitable and hand over final positions to M&E teams.

Discuss a site in this region – Cikarang

Batam

Batam's island location makes the port-to-site handover a distinct part of the delivery chain. KLOSE agrees receipt and equipment-condition checks after any sea transfer, then offloads, stages and positions power and cooling plant; transport and customs support can involve specialist partners.

Discuss a site in this region – Batam

Cities are project regions, not KLOSE offices. Delivery and mobilisation are confirmed against the site scope.

A defined route to handover.

  1. Send the equipment package

    Share the site location, equipment schedule, weights, dimensions, centre-of-gravity and lifting-point information, layout drawings and required installation dates. Identify whether the work is new build, phased expansion or replacement.

  2. Verify access & agree the method

    Review the unloading area, temporary openings, protected internal route, floor and ground load limits, overhead clearances and final bases. Confirm lifting and skidding methods, exclusion zones and permits with the project team.

  3. Mobilise & execute the movements

    KLOSE's crew carries out the agreed lifting and installation scope to the site sequence. Specialist partners may support transport, customs or heavy-crane work; responsibilities and handover points are defined before mobilisation.

  4. Align, inspect & release

    Check final position against agreed references, record the condition of the equipment and hand over the completed scope. Release the area to follow-on trades with any outstanding items clearly recorded.

Before you appoint a lifting contractor.

What do you need to prepare a quotation?

Send the equipment list with weights and dimensions, supplier handling instructions, site and room layouts, delivery sequence and target dates. Include access photographs, known floor limits and the proposed scope split. KLOSE identifies survey requirements and outstanding technical information before confirming the method and commercial scope.

Can you work in an operational or phased facility?

Replacement and expansion work can be scoped around operator-controlled access, permit systems and agreed working windows. We define protected routes, exclusion zones and phase boundaries with the site team. Isolation, service continuity and permission to work remain subject to the operator's procedures; uptime is not guaranteed by a lifting method.

Do you provide transport, heavy cranes and local offices?

The cities shown are project regions, not a branch network. KLOSE mobilises for the agreed site scope. Specialist partners may provide transport, customs support or heavy cranes when required, with responsibility and equipment transfer points recorded in the proposal.

Does positioning include connection and commissioning?

Not automatically. Offloading, move-in, positioning and agreed M&E installation support are defined in the work package. Electrical connection, energisation, testing and commissioning are separate unless expressly included and assigned to appropriately qualified parties.

Start with the equipment and the constraints

Share the project location, equipment list, weights, dimensions, drawings and target delivery sequence. KLOSE can review the handling interfaces with your engineering or EPC team and help define a project-specific scope.

Methods, resources and the scope of work are confirmed following site review and agreement on project requirements.