Ressources & Téléchargements
Guides pratiques et listes de contrôle pour vous aider à planifier et à réduire les risques de votre prochaine relocalisation industrielle, emballage ou projet de service sur site.
A buyer's checklist for anyone procuring an industrial move: how to write a scope that makes quotes truly comparable, the questions that separate specialists from box-movers, the insurance and liability terms to nail down, and how transparency and a single accountable partner keep a complex move under control.
A specification checklist for procuring export and industrial packaging: how to specify protection for the real journey, the standards that keep shipments compliant (ISPM-15, moisture and corrosion protection), how to compare packers on capability, and the insurance and documentation that make a damage claim actually payable.
A selection checklist for OEMs and machine builders appointing an installation, commissioning and field-service partner: how to define the scope you hand over, verify capability and qualifications, protect your machine warranty and IP, and lock down liability before mobilisation — choosing on accountability, not day rate.
Our capability statement for EPC contractors and data-centre operators: how KLOSE places, installs and helps energise mission-critical plant faster using electric pick & carry cranes and European rigging gear — emissions-free indoor lifting, precision positioning, and M&E installation of transformers, switchgear, chillers, gensets and UPS. Australia-wide, with a Perth & Western Australia focus.
A site-readiness checklist for taking delivery of new machinery: how to survey the delivery route and floor loading before the truck arrives, what the OEM's installation manual really requires, utilities and foundation readiness, precision positioning and alignment, and the handover documentation that protects your warranty.
Une liste de contrôle de planification de levage destinée à toute personne mandatant des travaux de grue ou de gréage lourd : les données de charge dont dépend tout plan de levage, les vérifications des conditions de sol et des accès, le contenu d’une étude de levage dûment ingénierée, les certifications et inspections à vérifier, ainsi que les zones d’exclusion, les permis et les critères d’interruption qui sécurisent un levage lourd.
A project checklist for decommissioning production equipment or whole plants: safe isolation and de-energisation, draining and handling residual media, protecting asset value for resale or redeployment, dismantling method and sequencing, and the environmental and documentation duties that survive long after the plant is gone.