Sterile Filling Line Relocation and Validation Support
Project Overview
A pharmaceutical manufacturer relocated a high-value aseptic filling line between facilities and engaged KLOSE for dismantling, protected transport, precision reinstallation and support through requalification. Every step was executed under documented protocols suited to a regulated, GMP environment.
KLOSE coordinated with the customer's qualification and quality teams to ensure the line was reinstated to specification and ready for the validation programme.
Project Challenges
- Aseptic equipment is highly sensitive and operates in a tightly regulated environment, so handling, positioning and documentation all had to meet GMP expectations. Precise re-levelling and alignment were essential for the line to pass requalification.
The Klose Advantage
- KLOSE's precision-positioning capability and documented, method-driven approach matched the rigour a regulated pharmaceutical move demands. Self-performed reinstatement and close cooperation with the customer's quality team supported a smooth path to requalification.
Outcome
Aseptic line relocated, re-levelled and supported through requalification with full documentation
Discuss a similar project
Klose Industrial Service delivers industrial relocations, decommissioning, heavy lifting, and assembly across Europe and Asia Pacific. Contact our team or call +4917611904090.