Full Factory Relocation of 250+ Machines for a Manufacturer
Project Overview
KLOSE relocated an entire manufacturing operation of more than 250 machines into a new facility, covering decommissioning, packing, transport, reinstallation and recommissioning support. The move was phased so the customer could ramp the new site while winding down the old one.
Detailed planning, asset tracking and coordinated logistics kept the large, complex programme under control from first machine to last.
Project Challenges
- Relocating hundreds of machines while keeping production downtime to a minimum demands meticulous sequencing, accurate asset tracking and tight coordination across two sites and many simultaneous workstreams.
The Klose Advantage
- KLOSE's project management, in-house crews and proven full-factory relocation methodology kept the programme on schedule and the customer producing, delivering a controlled transition into the new facility.
Outcome
More than 250 machines relocated and recommissioned with minimal production downtime
Discuss a similar project
Klose Industrial Service delivers industrial relocations, decommissioning, heavy lifting, and assembly across Europe and Asia Pacific. Contact our team or call +4917611904090.